# The BI migration playbook: from rationalization to sign-off

> Run a BI migration with your own agents and tools: six phases, decision gates, validation evidence, and clear routes for handling failures.

BI modernization · By EntityBI editorial · Published 2026-11-17 · Updated 2026-11-17 · 10 min read
Canonical: https://www.entitybi.com/articles/the-bi-migration-playbook

A practical six-phase BI migration playbook for teams using their own agents and tools, with decision gates, validation evidence, and routes for resolving failures.

Every [BI migration](https://www.entitybi.com/glossary#bi-migration) article covers one phase — rationalization, conversion, testing, or governance. None provides a single end-to-end playbook that connects all phases with specific handoffs, decision gates, and measurable exit criteria. The reader is left believing migration is a linear pipeline, not realising it is a feedback loop with six interdependent phases.

## The scenario

A migration lead at a mid-market company is six weeks into a Tableau to Power BI migration. The estate has 1,200 workbooks. The plan was simple: convert workbooks, test them, ship them. Six weeks in, the team has converted 80 workbooks and validated 12. The backlog is growing. The steering committee is asking for a revised timeline.

The problem is not the team. The problem is the plan. It treated migration as a single pass — convert everything, then test everything, then ship everything — when the reality is that each phase feeds back into the ones before it. A conversion error discovered in testing means the conversion logic must be fixed and the report re-converted. A report that cannot be validated because the source data is unavailable means the rationalization phase missed a dependency. A governance gap discovered mid-project means the agent's permissions must be re-scoped, which blocks the conversion pipeline.

The migration lead needs a playbook — not a delivery schedule, but a decision framework that tells her what to do at each phase, what to hand off to the next phase, and what to do when something goes wrong.

> This scenario is illustrative. Actual results depend on estate complexity, platform pair, team composition, and data quality.

## The gap

Most migration plans are built around a single variable: report count. The plan assumes that if you know how many reports you have, you can estimate the timeline and team size. This assumption misses three structural factors.

**First, report count is not migration scope.** As covered in [BI inventory rationalization: a working framework](https://www.entitybi.com/articles/bi-inventory-rationalization-a-working-framework), between 35% and 50% of reports in a typical estate are unused, duplicated, or not migration candidates. A plan built on raw report count overestimates scope by 2x before the first conversion starts.

**Second, conversion is not validation.** As covered in How do you prove a migrated report is actually correct?, a report that opens without errors in the target platform is not a migrated report. It is a converted file. Validation requires row-level parity testing, formula-by-formula comparison, and dependency-aware error detection. A plan that treats conversion as the completion milestone is measuring the wrong thing.

**Third, complexity is not uniform.** Two estates with the same report count can require very different effort because of calculation complexity, data dependencies, and shared objects. A plan based on report count alone misses the shape of the estate.

Migration is not a one-way pipeline. It is a feedback loop with six phases, each of which can send work back to an earlier phase. This framework connects the handoffs, decision gates, and re-entry paths so teams can plan for that work explicitly.

## The playbook: the six-phase migration playbook

Here is the six-phase playbook. Each phase has a concrete output, a decision gate, and a re-entry path for work that fails its exit criteria.

![Six-phase BI migration governance flow with decision gates and rework routes.](https://cdn.sanity.io/images/8829fkyq/production/fee255c30c03f31cec1416b0a489475bd192997d-2660x3660.png?w=1200&fit=max&auto=format)
*BI migration decision gates and rework routes*

### Phase 1: Rationalize

**Objective:** Determine the actual migration scope by measuring usage, detecting duplication, and applying the four-bucket decision (keep, merge, retire, migrate).

**Input:** Raw report inventory from the source platform.

**Output:** A rationalization plan with every report assigned to a bucket, the canonical report for each duplicate cluster, and the evidence for each decision.

**Exit criteria:** The migration scope (reports in the "keep" and "merge" buckets) is confirmed and signed off by business stakeholders.

**Re-entry path:** If a report fails validation in Phase 4 because it depends on a data source that was not catalogued, the rationalization phase must be re-entered to update the inventory and re-assess the report's bucket.

### Phase 2: Govern

**Objective:** Define the permission model for the migration agent — what it can read, what it can write, and what requires human approval.

**Input:** The rationalization plan (which reports, data sources, and platforms are in scope).

**Output:** A per-workspace tool allowlist that categorises every action as read, write, or validate, scoped to specific connections and tables, with human approval required for consequential changes.

**Exit criteria:** The agent can read all source reports and data sources in scope, write to the target workspace, and validate against both — and cannot do anything else.

**Re-entry path:** If a report in scope connects to a data source that was not included in the allowlist, the governance phase must be re-entered to update the permissions.

### Phase 3: Convert

**Objective:** Convert each report from source to target format with provably correct formula translation.

**Input:** The rationalization plan (scope) and the governance allowlist (permissions).

**Output:** A converted report in the target platform, with a validation report showing the parity score for every formula.

**Exit criteria:** Formula-level parity ≥ 95% across all converted reports. Reports below this threshold are flagged for manual review or re-conversion with corrected mapping logic.

**Re-entry path:** If a formula pattern is not recognised by the parser, the conversion phase must be re-entered with an updated mapping for that pattern. This is the most common re-entry path in the loop.

- The LOD-to-[DAX](https://www.entitybi.com/glossary#dax) mapping patterns from Tableau LOD expressions to DAX: the complete guide
- The converter-vs-agent distinction from What's the difference between a BI conversion tool and an AI migration agent? — the validate-fix loop is what makes this phase work
- The platform-specific patterns from MicroStrategy to Power BI: what transfers and what gets rebuilt for shared-object dependencies

### Phase 4: Test

**Objective:** Verify that every number in the converted report matches the source report for the same query, under the same filters, with the same aggregations.

**Input:** The converted report and its validation report from Phase 3.

**Output:** A parity report showing the match percentage for every row, every measure, and every filter context in the report.

**Exit criteria:** Every report achieves ≥ 99.5% row-level parity. Reports below this threshold are sent back to Phase 3 for re-conversion with corrected mapping logic.

**Re-entry path:** If a report fails parity testing, the conversion phase must be re-entered. The error pattern (wrong aggregation, missing filter, incorrect LOD mapping) is fed back into the conversion engine to prevent the same error in future conversions.

### Phase 5: Sign-off

**Objective:** Obtain formal acceptance from business stakeholders that each migrated report is correct and fit for purpose.

**Input:** The parity report from Phase 4 for each report.

**Output:** A signed-off report certificate for each report, or an exception log for reports that were accepted with known deviations.

**Exit criteria:** Every report in scope has either a sign-off certificate or an accepted exception. The exception log is reviewed and approved by the steering committee.

**Re-entry path:** If a stakeholder rejects a report during sign-off, the report is sent back to Phase 4 for additional testing, or to Phase 3 for re-conversion if the rejection identifies a formula error.

### Phase 6: Decommission

**Objective:** Retire the source platform by archiving source reports, rewiring dependencies, and confirming that the target platform is the system of record.

**Input:** The signed-off report certificates from Phase 5.

**Output:** A decommissioning report showing that every source report has been archived, every downstream dependency has been rewired to the target, and the source platform is in read-only mode.

**Exit criteria:** The source platform is in read-only mode and all downstream consumers are confirmed to be using the target platform.

**Re-entry path:** If a downstream dependency is discovered after decommissioning (a report that was missed in the inventory, a data feed that was not rewired), the decommission phase must be re-entered to archive the dependency and rewire it.

## What the loop looks like when it runs on an agent platform

Where an agent platform supports parts of this workflow, it may reduce repetitive work and make re-entry easier to track. Automation does not remove the need for review, source access, test design, or stakeholder sign-off.

![Vertical BI migration pipeline showing feedback and rework routes between phases.](https://cdn.sanity.io/images/8829fkyq/production/494bf40b3bc025846869ef8e96678b6ae7ab328d-2200x2540.png?w=1200&fit=max&auto=format)
*BI migration pipeline and feedback routes*

Here is what changes:

**Rationalize becomes continuous.** Where source-platform APIs and usage data are available, teams can automate parts of inventory collection and schedule updates. Duplicate detection can compare report structure and calculations, with human review for ambiguous matches.

**Govern becomes auditable.** Every tool call is logged. Every permission grant is scoped to a workspace and a connection. The audit log is queryable. If a governance gap is discovered mid-project, the fix is a configuration change, not a process renegotiation.

**Convert becomes a feedback loop.** Unsupported formula patterns can be flagged for review. Once a team verifies a mapping, it can add that mapping to documented rules or conversion logic and test it against affected reports. This improvement requires explicit review and regression testing; it should not be assumed to happen automatically.

**Test becomes comprehensive.** Automated comparisons can help check measures, rows, filters, and dependencies where equivalent source and target data are accessible. Teams should define coverage and tolerances, investigate mismatches, and retain human review for exceptions. A parity report is evidence for sign-off, not a substitute for it.

**Sign-off becomes a dashboard.** Stakeholders see a live view of every report's parity score, exception log, and certificate status. They sign off from the dashboard, not from a spreadsheet.

**Decommission becomes verifiable.** The agent confirms that every source report has been archived, every dependency has been rewired, and the source platform is in read-only mode. The decommissioning report is generated automatically.

Automation may shorten parts of a migration, but schedule depends on estate size, complexity, data access, review capacity, and validation scope. Estimate those factors during discovery rather than assuming a fixed timeline.

## In practice

A migration lead at a mid-market company is planning a Tableau to Power BI migration. The estate has 1,200 workbooks. She adopts the six-phase playbook.

**Phase 1 (Rationalize):** She runs the four-step framework. The inventory reveals 200 test artefacts. The usage data shows 300 cold reports. The duplicate search finds 150 near-duplicates of 30 canonical reports. The actual migration scope: 580 reports.

**Phase 2 (Govern):** She configures the agent workspace. The agent can read Tableau Server and the source data warehouse, write to the Power BI target workspace, and validate against both. Every write action requires human approval. The allowlist is scoped to the 580 reports in scope.

**Phase 3 (Convert):** The agent converts the 580 reports. The first pass achieves 92% formula parity. The 8% gap is analysed: 3% are LOD patterns the parser had not seen (fiscal-calendar offsets with table calculations), 3% are custom SQL in calculated fields, and 2% are parameter-dependent filters. The team reviews the patterns, documents and tests supported mappings, and rechecks affected reports. Any parity figures in this example describe the scenario only; they are not a guarantee of product performance.

**Phase 4 (Test):** The team tests all 580 reports against its agreed criteria. Reports that fail are triaged: formula or mapping defects return to conversion, while source-data or test-setup issues are corrected before rerunning the test. The scenario assumes all issues are resolved before sign-off; actual outcomes will vary.

**Phase 5 (Sign-off):** Stakeholders review the parity reports from a dashboard. 575 reports are signed off. 5 have accepted exceptions (visual formatting differences that do not affect the numbers). The exception log is approved.

**Phase 6 (Decommission):** The agent archives the 580 source reports, rewires downstream dependencies, and confirms Tableau Server is in read-only mode. The decommissioning report is generated.

For planning purposes, this illustrative scenario assumes a 14-week schedule. That is not a forecast or customer result; validate it against dependencies, data readiness, review capacity, and selected testing coverage.

> This scenario is illustrative. Actual results depend on estate complexity, platform pair, team composition, and data quality.

## What to do next

This week, run Phase 1 (Rationalize) on a sample of 50 reports. Build the inventory, measure usage, find the duplicates, and apply the four-bucket decision. Extrapolate to your full estate. If the number surprises you, the rationalization opportunity is real, and you have the playbook to capture it.

Use the playbook with the agent tools, source-platform access, and review process available to your team.

## Further reading

Read more: [BI inventory rationalization: a working framework](https://www.entitybi.com/articles/bi-inventory-rationalization-a-working-framework) · [What actually makes a BI migration expensive](https://www.entitybi.com/articles/what-actually-makes-a-bi-migration-expensive) · [Building AI agents for enterprise analytics](https://www.entitybi.com/articles/building-ai-agents-for-enterprise-analytics)